Photoelectric Sensors - SICK

Photoelectric sensors use a beam of light to detect objects without touching them, often from several meters away. They are a staple of packaging, material handling and assembly lines, counting cartons, checking for missing parts and confirming that a product is in position.

Sensing Modes

  • Through-beam – separate emitter and receiver for the longest range and highest reliability
  • Retroreflective – a single sensor and reflector, easy to align across conveyors
  • Polarized retroreflective – detects shiny and wrapped objects without false triggers
  • Diffuse and background suppression – sense the target directly and ignore what's behind it
  • Clear object and contrast sensors – for bottles, film and printed marks

Selecting the Right Sensor

Consider range, target size, color and surface, and whether there's room for a reflector or receiver. Laser and red-light versions make alignment easier, and IO-Link models allow remote setup and diagnostics. For washdown areas, look for stainless housings rated IP67 or IP69K.

Centro carries photoelectric sensors from trusted automation brands, along with the cables, reflectors and brackets to install them.

Related categories: Automation & Robotics Sensors | Inclination Sensors | Magnetic Cylinder Sensors | Sensor Adapters | Sensor Cables

Filter
Filter
3,812 items
content loaded
SICK - 6022488 VL18-3P6340 RETRO-REFL. SENS., Unit of Measure PC

$163.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6022491 VTF18-4N1112S01 P. PROX. SENS. ENERG., Unit of Measure PC

$136.65

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026209 VT12T-2N112 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026210 VT12T-2N410 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026211 VT12T-2P112 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026212 VT12T-2P410 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026213 VT12T-2N132 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026214 VT12T-2N430 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026215 VT12T-2P132 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026216 VT12T-2P430 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026217 VL12-2N132 RETRO-REFL. SENS., Unit of Measure PC

$156.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026218 VL12-2N430 RETRO-REFL. SENS., Unit of Measure PC

$156.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026219 VL12-2P132 RETRO-REFL. SENS., Unit of Measure PC

$156.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026220 VL12-2P430 RETRO-REFL. SENS., Unit of Measure PC

$156.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026221 VS/VE12-2N132 THROUGH-BEAM SENS., Unit of Measure PC

$221.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026222 VS/VE12-2N430 THROUGH-BEAM SENS., Unit of Measure PC

$221.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026223 VS/VE12-2P132 THROUGH-BEAM SENS., Unit of Measure PC

$221.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026224 VS/VE12-2P430 THROUGH-BEAM SENS., Unit of Measure PC

$221.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026229 VS12-2D132 THROUGH-BEAM S. SEND., Unit of Measure PC

$110.90

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026230 VS12-2D430 THROUGH-BEAM S. SEND., Unit of Measure PC

$110.90

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026232 VE12-2N430 THROUGH-BEAM S. RCVR, Unit of Measure PC

$164.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026233 VE12-2P132 THROUGH-BEAM S. RCVR, Unit of Measure PC

$164.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026234 VE12-2P430 THROUGH-BEAM S. RCVR, Unit of Measure PC

$164.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6027418 VTE18L-4P324 P. PROX. SENS. ENERG., Unit of Measure PC

$279.23

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6022488 VL18-3P6340 RETRO-REFL. SENS., Unit of Measure PC

$163.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6022491 VTF18-4N1112S01 P. PROX. SENS. ENERG., Unit of Measure PC

$136.65

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026209 VT12T-2N112 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026210 VT12T-2N410 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026211 VT12T-2P112 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026212 VT12T-2P410 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026213 VT12T-2N132 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026214 VT12T-2N430 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026215 VT12T-2P132 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026216 VT12T-2P430 P. PROX. SENS. ENERG., Unit of Measure PC

$146.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026217 VL12-2N132 RETRO-REFL. SENS., Unit of Measure PC

$156.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026218 VL12-2N430 RETRO-REFL. SENS., Unit of Measure PC

$156.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026219 VL12-2P132 RETRO-REFL. SENS., Unit of Measure PC

$156.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026220 VL12-2P430 RETRO-REFL. SENS., Unit of Measure PC

$156.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026221 VS/VE12-2N132 THROUGH-BEAM SENS., Unit of Measure PC

$221.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026222 VS/VE12-2N430 THROUGH-BEAM SENS., Unit of Measure PC

$221.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026223 VS/VE12-2P132 THROUGH-BEAM SENS., Unit of Measure PC

$221.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026224 VS/VE12-2P430 THROUGH-BEAM SENS., Unit of Measure PC

$221.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026229 VS12-2D132 THROUGH-BEAM S. SEND., Unit of Measure PC

$110.90

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026230 VS12-2D430 THROUGH-BEAM S. SEND., Unit of Measure PC

$110.90

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026232 VE12-2N430 THROUGH-BEAM S. RCVR, Unit of Measure PC

$164.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026233 VE12-2P132 THROUGH-BEAM S. RCVR, Unit of Measure PC

$164.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6026234 VE12-2P430 THROUGH-BEAM S. RCVR, Unit of Measure PC

$164.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

SICK - 6027418 VTE18L-4P324 P. PROX. SENS. ENERG., Unit of Measure PC

$279.23

Should ship between 13 Nov and 20 Nov

Subject to factory lead times