Swivel Joints

Swivel joints are crucial components used to connect pipes or hoses in a fluid system, allowing for rotation and movement in various directions. These versatile joints are commonly employed in industries like oil and gas, chemical processing, and firefighting, where flexible connections are essential to accommodate movement, vibration, and thermal expansion. Swivel joints provide a reliable solution for preventing hose or pipe kinks, reducing stress on equipment, and enabling smooth fluid transfer even in challenging environments. With different sizes, materials, and pressure ratings available, swivel joints offer the flexibility needed to meet specific application requirements and ensure efficient fluid handling.

Filter
Filter
2,669 items
content loaded
3920F-0201 - 2" FAB SST SWIVEL JT BUNA-N MAIN SEAL FELT DUST SEAL - OPW

$2,761.74

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0201-LT - 2" SWIVEL, SST, LOW TEMP BUNA, 150# FLANGE X 150# FLANGE - OPW

$2,852.22

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0202 - 2" FAB SST SWIVEL JT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$2,785.15

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0203 - 2" FAB SST SWIVEL JOINT TEFLON/GTR MAIN FELT DUST SEAL - OPW

$2,878.84

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0204 - 2" FAB SST SWIVEL JOINT EPT MAIN FELT DUST SEAL - OPW

$2,777.70

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0205-FDA - 2" SWIVEL, SST, FOOD GRADE NITRILE, 150 FLANGE X 150 FLANGE, FDA LUBE - OPW

$2,776.64

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0301 - 3" FAB SST SWIVEL JOINT BUNA-N MAIN FELT DUST SEAL - OPW

$4,101.07

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0301-GL - 3" SWIVEL, SST, BUNA, 150# FLGS, GREASELESS - OPW

$4,112.79

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0302 - 3" FAB SST SWIVEL JOINT FLUOROCARBON MAIN FELT DUST SEAL" - OPW

$4,154.31

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0303 - 3" FAB SST SWIVEL JOINT TFE/GTR MAIN FELT DUST SEAL - OPW

$4,237.35

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0303-GTR - 3" SWIVEL, SST, PTFE GARTER, 150 FLGS - OPW

$4,242.68

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0303-O2 - 3" SWIVEL, SST, PTFE, 150# FLANGE X 150# FLANGE, OXYGEN SERVICE - OPW

$6,878.49

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0304 - 3" FAB. SST SWIVEL JOINT EPT MAIN SEAL FELT DUST SEAL - OPW

$4,128.75

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0305 - 3" FAB SST SWIVEL JOINT FDA BUNA MAIN FELT DUST SEAL - OPW

$4,133.02

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0401 - 4" FAB SST SWIVEL JOINT BUNA-N MAIN FELT DUST SEAL - OPW

$4,919.65

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0401-LT - 4" SWIVEL, SST, LOW TEMP BUNA, 150# FLANGE X 150# FLANGE - OPW

$3,654.26

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0402 - 4" FAB SST SWIVEL JOINT FLUOROCARBON MAIN FELT DUST SEAL" - OPW

$4,927.18

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0403 - 4" SWIVEL, SST, PTFE, FELT DUST - OPW

$4,975.16

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0403-GTR - 4" SWIVEL, SST, PTFE GARTER, 150# FLGS - OPW

$5,091.67

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0404 - 4" FAB SST SWIVEL JOINT EPT MAIN SEAL FELT DUST SEAL - OPW

$4,898.15

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0405 - 4" FAB SST SWIVEL JOINT FDA NITRILE MAIN SEAL - OPW

$4,890.63

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0601 - 6" FAB SST SWIVEL JT BUNA-N MAIN SEAL FELT DUST SEAL - OPW

$9,339.38

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0602 - 6" FAB SST SWIVEL JOINT FLUOROCARBON MAIN FELT DUST SEAL" - OPW

$9,503.88

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0602-LT - 6" SWIVEL, SST, FLUOROCARBON GFLT, 150# FLANGE X 150# FLANGE" - OPW

$9,568.38

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0201 - 2" FAB SST SWIVEL JT BUNA-N MAIN SEAL FELT DUST SEAL - OPW

$2,761.74

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0201-LT - 2" SWIVEL, SST, LOW TEMP BUNA, 150# FLANGE X 150# FLANGE - OPW

$2,852.22

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0202 - 2" FAB SST SWIVEL JT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$2,785.15

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0203 - 2" FAB SST SWIVEL JOINT TEFLON/GTR MAIN FELT DUST SEAL - OPW

$2,878.84

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0204 - 2" FAB SST SWIVEL JOINT EPT MAIN FELT DUST SEAL - OPW

$2,777.70

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0205-FDA - 2" SWIVEL, SST, FOOD GRADE NITRILE, 150 FLANGE X 150 FLANGE, FDA LUBE - OPW

$2,776.64

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0301 - 3" FAB SST SWIVEL JOINT BUNA-N MAIN FELT DUST SEAL - OPW

$4,101.07

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0301-GL - 3" SWIVEL, SST, BUNA, 150# FLGS, GREASELESS - OPW

$4,112.79

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0302 - 3" FAB SST SWIVEL JOINT FLUOROCARBON MAIN FELT DUST SEAL" - OPW

$4,154.31

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0303 - 3" FAB SST SWIVEL JOINT TFE/GTR MAIN FELT DUST SEAL - OPW

$4,237.35

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0303-GTR - 3" SWIVEL, SST, PTFE GARTER, 150 FLGS - OPW

$4,242.68

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0303-O2 - 3" SWIVEL, SST, PTFE, 150# FLANGE X 150# FLANGE, OXYGEN SERVICE - OPW

$6,878.49

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0304 - 3" FAB. SST SWIVEL JOINT EPT MAIN SEAL FELT DUST SEAL - OPW

$4,128.75

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0305 - 3" FAB SST SWIVEL JOINT FDA BUNA MAIN FELT DUST SEAL - OPW

$4,133.02

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0401 - 4" FAB SST SWIVEL JOINT BUNA-N MAIN FELT DUST SEAL - OPW

$4,919.65

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0401-LT - 4" SWIVEL, SST, LOW TEMP BUNA, 150# FLANGE X 150# FLANGE - OPW

$3,654.26

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0402 - 4" FAB SST SWIVEL JOINT FLUOROCARBON MAIN FELT DUST SEAL" - OPW

$4,927.18

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0403 - 4" SWIVEL, SST, PTFE, FELT DUST - OPW

$4,975.16

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0403-GTR - 4" SWIVEL, SST, PTFE GARTER, 150# FLGS - OPW

$5,091.67

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0404 - 4" FAB SST SWIVEL JOINT EPT MAIN SEAL FELT DUST SEAL - OPW

$4,898.15

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0405 - 4" FAB SST SWIVEL JOINT FDA NITRILE MAIN SEAL - OPW

$4,890.63

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0601 - 6" FAB SST SWIVEL JT BUNA-N MAIN SEAL FELT DUST SEAL - OPW

$9,339.38

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0602 - 6" FAB SST SWIVEL JOINT FLUOROCARBON MAIN FELT DUST SEAL" - OPW

$9,503.88

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3920F-0602-LT - 6" SWIVEL, SST, FLUOROCARBON GFLT, 150# FLANGE X 150# FLANGE" - OPW

$9,568.38

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

FAQS