Disconnect Switches - ABB

Disconnect switches isolate equipment from power so maintenance can be done safely. They're required by code for motors and machines, and support lockout/tagout procedures.

Disconnect Types

  • Fusible disconnects – isolation with fuse protection
  • Non-fusible disconnects – isolation only
  • Rotary disconnects – panel-mount with door handles
  • Enclosed safety switches – NEMA 1, 3R, 4X and 12
  • Accessories – handles, shafts and auxiliary contacts

Choosing a Disconnect

Select by voltage, amperage, horsepower rating, poles and enclosure. Confirm short-circuit ratings and code requirements.

Centro supplies disconnect switches and accessories.

Related categories: Circuit Protection | Circuit Monitoring | Fuse Blocks and Holders | Circuit Protection Accessories | Fuses

Filter
Filter
753 items
content loaded
4P 200A NF SW 1000VDC UL98B WO JUM

$1,523.49

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

6P 200A NF SW 1000VDC UL98B 3 CKTS

$2,285.24

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 200A DC SW 1500VDC SIDE OPERATED

$1,752.42

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 200A DC SW 1500VDC

$1,531.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 200A DC SW 1500VDC FOR HIGH SCCR

$2,455.21

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4P 200A DC SW 1500VDC

$2,838.84

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A UL PV SW 1000VDC

$1,480.83

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A PV SW 1000VDC

$1,480.83

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

DC SWITCH 250A 1000VDC 4P UL98B

$2,736.08

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A PV SW 1500VDC

$1,849.20

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A DC SW 1500VDC SIDE OPERATED

$2,012.02

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A DC SW 1500VDC

$1,761.84

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A DC SW 1500VDC FOR HIGH SCCR

$2,995.13

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4P 250A DC SW 1500VDC

$3,259.40

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2 POLE 25 AMP DISCONNECTOR SWITCH

$310.52

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

3 POLE 25 AMP DISCONNECTOR SWITCH

$443.61

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4 POLE 25 AMP DISCONNECTOR SWITCH

$650.63

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4 P 25 AMP DISCONNECTOR SW DOOR MNT

$650.63

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P NF SW 600VDC 25A UL508I BASE/DIN

$260.32

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 25A 600VDC NF SW DOOR MNT UL508I

$259.99

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 320A UL PV SW 1000VDC

$1,515.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

PV DISC SW 320A 1000VDC 2P UL98B

$1,515.02

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4P 320A UL PV SW 1000VDC

$2,801.97

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 320A PV SW 1500VDC

$1,893.77

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4P 200A NF SW 1000VDC UL98B WO JUM

$1,523.49

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

6P 200A NF SW 1000VDC UL98B 3 CKTS

$2,285.24

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 200A DC SW 1500VDC SIDE OPERATED

$1,752.42

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 200A DC SW 1500VDC

$1,531.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 200A DC SW 1500VDC FOR HIGH SCCR

$2,455.21

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4P 200A DC SW 1500VDC

$2,838.84

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A UL PV SW 1000VDC

$1,480.83

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A PV SW 1000VDC

$1,480.83

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

DC SWITCH 250A 1000VDC 4P UL98B

$2,736.08

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A PV SW 1500VDC

$1,849.20

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A DC SW 1500VDC SIDE OPERATED

$2,012.02

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A DC SW 1500VDC

$1,761.84

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 250A DC SW 1500VDC FOR HIGH SCCR

$2,995.13

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4P 250A DC SW 1500VDC

$3,259.40

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2 POLE 25 AMP DISCONNECTOR SWITCH

$310.52

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

3 POLE 25 AMP DISCONNECTOR SWITCH

$443.61

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4 POLE 25 AMP DISCONNECTOR SWITCH

$650.63

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4 P 25 AMP DISCONNECTOR SW DOOR MNT

$650.63

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P NF SW 600VDC 25A UL508I BASE/DIN

$260.32

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 25A 600VDC NF SW DOOR MNT UL508I

$259.99

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 320A UL PV SW 1000VDC

$1,515.45

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

PV DISC SW 320A 1000VDC 2P UL98B

$1,515.02

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

4P 320A UL PV SW 1000VDC

$2,801.97

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

2P 320A PV SW 1500VDC

$1,893.77

Should ship between 13 Nov and 20 Nov

Subject to factory lead times