Standard Power Supplies - ABB

Standard power supplies are essential devices that convert incoming electrical energy into a suitable and stable form to power electronic equipment and devices. These power supplies provide a consistent and regulat...

Categories from ABB (2)
Transformers
Transformers

Power supply transformers step line voltage down to the levels needed by control circuits, power supplies and equipment. They also provide isolation for safer, quieter operation.

Transformer Options

  • Control transformers – machine control circuits
  • Step-down transformers – equipment power
  • Isolation transformers – noise reduction
  • DIN rail transformers – compact panel mounting
  • Fused transformers – built-in protection

Choosing a Transformer

Select primary and secondary voltages and VA rating with margin for inrush. Confirm mounting style and overcurrent protection.

Centro supplies transformers for control panels and power supplies.

Related categories: Standard Power Supplies | Standard Power Supplies | Power Supplies | Control Transformers | Transformer Accessories

Control Transformers
Control Transformers

Control transformers supply stable, isolated low voltage, usually 120V or 24V, to control circuits in machines and panels. They handle the inrush current of contactors, relays and solenoids.

Features

  • Multiple primary taps – flexible input voltages
  • High inrush capacity – reliable coil switching
  • Fuse block options – built-in protection
  • Finger-safe terminals – safer wiring

Choosing a Transformer

Size VA by adding sealed and inrush loads of connected devices, then confirm primary and secondary voltages. Follow NEC overcurrent requirements.

Centro supplies control transformers for industrial panels.

Related categories: Standard Power Supplies | Power Supplies | Transformer Accessories | Transformers | Standard Power Supplies

Filter
Filter
1,236 items
content loaded
1C,0.5kVA,600(-2 5%)-120/240,100C,3R,QB

$1,647.30

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.75kVA,600(-2 5%)-120/240,100C,3R,QB

$2,096.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1kVA,600(-2 5%)-120/240,100C,3R,QB

$3,140.69

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1.5kVA,600(-2 5%)-120/240,100C,3R,QB

$3,871.50

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,600(-2 5%)-120/240,100C,3R,QB

$4,715.40

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,3kVA,600(-2 5%)-120/240,115C,3R,QB

$6,029.10

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.1kVA,600-120/240,55C,3R,50/60Hz,QB

$770.16

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.25kVA,600-120/240,80C,3R,50/60Hz,QB

$1,169.52

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,600-120/240,100C,3R,50/60Hz,QB

$4,584.90

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,3kVA,600-120/240,115C,3R,50/60Hz,QB

$5,863.79

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.05kVA,240x480-120/240,55C,3R,BB,QB

$503.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.75kVA,240x480-120/240,100C,3R,BB,QB

$1,504.19

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1kVA,240x480-120/240,100C,3R,BB,QB

$2,261.38

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1.5kVA,240x480-120/240,100C,3R,BB,QB

$2,759.89

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,240x480-120/240,100C,3R,BB,QB

$3,395.68

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,3kVA,240x480-120/240,100C,3R,BB,QB

$4,204.86

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1kVA,600-120/240,100C,N3R,BB,QB

$2,384.20

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,600-120/240,100C,N3R,BB,QB

$3,532.95

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,3kVA,600-120/240,100C,N3R,BB,QB

$4,342.14

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.15kVA,240x480-110/220,55C,N3R,QB

$1,907.95

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.25kVA,240(±2,5%)-110,100,3R,50Hz,QB

$1,062.54

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.5kVA,240(±2,5%)-110,100C,3R,50Hz,QB

$1,647.30

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1kVA,252/240/228-110,100C,N3R,50Hz,QB

$2,905.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,240(±2,5%)-110,100C,N3R,50Hz,QB

$4,332.60

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.5kVA,600(-2 5%)-120/240,100C,3R,QB

$1,647.30

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.75kVA,600(-2 5%)-120/240,100C,3R,QB

$2,096.55

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1kVA,600(-2 5%)-120/240,100C,3R,QB

$3,140.69

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1.5kVA,600(-2 5%)-120/240,100C,3R,QB

$3,871.50

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,600(-2 5%)-120/240,100C,3R,QB

$4,715.40

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,3kVA,600(-2 5%)-120/240,115C,3R,QB

$6,029.10

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.1kVA,600-120/240,55C,3R,50/60Hz,QB

$770.16

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.25kVA,600-120/240,80C,3R,50/60Hz,QB

$1,169.52

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,600-120/240,100C,3R,50/60Hz,QB

$4,584.90

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,3kVA,600-120/240,115C,3R,50/60Hz,QB

$5,863.79

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.05kVA,240x480-120/240,55C,3R,BB,QB

$503.37

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.75kVA,240x480-120/240,100C,3R,BB,QB

$1,504.19

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1kVA,240x480-120/240,100C,3R,BB,QB

$2,261.38

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1.5kVA,240x480-120/240,100C,3R,BB,QB

$2,759.89

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,240x480-120/240,100C,3R,BB,QB

$3,395.68

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,3kVA,240x480-120/240,100C,3R,BB,QB

$4,204.86

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1kVA,600-120/240,100C,N3R,BB,QB

$2,384.20

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,600-120/240,100C,N3R,BB,QB

$3,532.95

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,3kVA,600-120/240,100C,N3R,BB,QB

$4,342.14

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.15kVA,240x480-110/220,55C,N3R,QB

$1,907.95

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.25kVA,240(±2,5%)-110,100,3R,50Hz,QB

$1,062.54

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,0.5kVA,240(±2,5%)-110,100C,3R,50Hz,QB

$1,647.30

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,1kVA,252/240/228-110,100C,N3R,50Hz,QB

$2,905.80

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

1C,2kVA,240(±2,5%)-110,100C,N3R,50Hz,QB

$4,332.60

Should ship between 13 Nov and 20 Nov

Subject to factory lead times

FAQS