Bulk Solids Filtration

At Centro, we provide a complete range of bulk solid filtration products online. Bulk solid filtration plays a major role in many conveying systems, designed to prevent fine particles from escaping while enhancing ...

Categories in Bulk Solids Filtration (4)
Conveying Systems
Conveying Systems

Conveying systems are integral to industrial operations, enabling the efficient, automated transport of bulk materials, components, or finished products across manufacturing, processing, and packaging environments. From belt and screw conveyors to pneumatic and tubular drag systems, each design is tailored to handle specific materials, flow rates, and spatial constraints. These systems improve throughput, reduce manual handling, and enhance safety, making them essential for optimizing productivity and material flow in industries such as food, pharmaceuticals, mining, and heavy manufacturing.

Metal Structures and Stairs
Metal Structures and Stairs

Metal structures and stairs, including platforms, mezzanines, and staircases, are engineered from durable materials like steel and aluminum. They provide secure access to elevated areas, optimizing space utilization, and facilitating smooth workflow logistics in manufacturing facilities, warehouses, and distribution centers. Designed for durability and resilience against heavy loads and challenging conditions, metal structures ensure long-term reliability and operational function. Our stairs promote safe vertical movement, adhering to safety standards and enhancing worker confidence. Browse our selection below or contact us to speak to a product specialist.

Expansion Joints
Expansion Joints

Expansion joints are essential for piping and ducting systems, designed to handle thermal expansion, contraction, vibration, and other dynamic movements. Expansion joints are vital in preventing damage caused by temperature changes and mechanical stress, ensuring the integrity and efficiency of the systems. Available in various types, including metal, rubber, and fabric, each type is designed for specific applications and environments. By accommodating movement and reducing stress, expansion joints help extend the lifespan and reliability of infrastructure in industries like construction, power generation, chemical processing, and water treatment. Choosing and installing the right expansion joints is crucial for optimal system performance and safety. Explore Centro's expansion joint offerings below or reach out to a product expert at Centro for assistance in selecting the right solution for your application.

Material Handling
Material Handling

The Material Handling category within the Bulk Solids division encompasses equipment and solutions designed to efficiently move, feed, store, and control the flow of bulk materials throughout the filtration process. From pneumatic conveying systems and mechanical conveyors to bins, feeders, and valves, these components ensure a consistent and controlled material stream—critical for optimizing filtration efficiency, reducing downtime, and maintaining product integrity.


Whether handling fine powders, granules, or abrasive solids, this category supports a wide range of industrial applications including chemical processing, food and beverage, pharmaceuticals, mining, and plastics. Material handling equipment is carefully engineered to integrate with filtration systems, improve throughput, and support dust control and contamination prevention measures.

Filter
Filter
11,411 items
content loaded
OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285G S/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$737.39

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285AM S/N 0487 TO 0109

$2,024.16

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285AM S/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$2,823.52

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-HDPS

$997.43

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-HD S/N 0793 TO 0109

$997.43

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-HD S/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$1,275.10

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A/E-HD SN 0793 TO 0109. Critical components to reduce risk of downtime and eliminate ship time.

$997.43

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285G-HD S/N 0793 TO 0109

$770.39

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285G-HDS/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$949.88

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285AM-HD S/N 0000 TO 0109

$2,001.22

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285AM-HD S/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$3,036.02

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-GR S/N 0793 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$1,031.94

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-GR S/N 0912 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$393.19

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285G-GR S/N 0108 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$726.46

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285XGR S/N 0108 TO 0722. Critical components to reduce risk of downtime and eliminate ship time.

$726.46

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285XGR S/N 405115 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$745.86

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-BP S/N 0306 TO 0509. Critical components to reduce risk of downtime and eliminate ship time.

$296.44

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-BP S/N 0609 TO 1110. Critical components to reduce risk of downtime and eliminate ship time.

$342.78

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-BP S/N 1210 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$410.75

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 1-300 S/N 174638 to 239042

$3,953.52

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 1-300 S/N 239043 to ______

$3,724.17

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 2-300 S/N 174638 to 239456

$5,345.13

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 2-300 S/N 239790 to ______

$5,115.78

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 1-305 SERIES. Critical components to reduce risk of downtime and eliminate ship time.

$1,018.89

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285G S/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$737.39

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285AM S/N 0487 TO 0109

$2,024.16

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285AM S/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$2,823.52

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-HDPS

$997.43

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-HD S/N 0793 TO 0109

$997.43

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-HD S/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$1,275.10

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A/E-HD SN 0793 TO 0109. Critical components to reduce risk of downtime and eliminate ship time.

$997.43

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285G-HD S/N 0793 TO 0109

$770.39

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285G-HDS/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$949.88

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285AM-HD S/N 0000 TO 0109

$2,001.22

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285AM-HD S/N 0209 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$3,036.02

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-GR S/N 0793 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$1,031.94

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-GR S/N 0912 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$393.19

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285G-GR S/N 0108 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$726.46

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285XGR S/N 0108 TO 0722. Critical components to reduce risk of downtime and eliminate ship time.

$726.46

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285XGR S/N 405115 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$745.86

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-BP S/N 0306 TO 0509. Critical components to reduce risk of downtime and eliminate ship time.

$296.44

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-BP S/N 0609 TO 1110. Critical components to reduce risk of downtime and eliminate ship time.

$342.78

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 285A-BP S/N 1210 TO ____. Critical components to reduce risk of downtime and eliminate ship time.

$410.75

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 1-300 S/N 174638 to 239042

$3,953.52

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 1-300 S/N 239043 to ______

$3,724.17

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 2-300 S/N 174638 to 239456

$5,345.13

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 2-300 S/N 239790 to ______

$5,115.78

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

OPTIONAL KIT, RECOMMENDED SPARE PARTS FOR 1-305 SERIES. Critical components to reduce risk of downtime and eliminate ship time.

$1,018.89

Should ship between 16 Nov and 23 Nov

Subject to factory lead times

FAQS