Swivel Joints

Swivel joints are crucial components used to connect pipes or hoses in a fluid system, allowing for rotation and movement in various directions. These versatile joints are commonly employed in industries like oil and gas, chemical processing, and firefighting, where flexible connections are essential to accommodate movement, vibration, and thermal expansion. Swivel joints provide a reliable solution for preventing hose or pipe kinks, reducing stress on equipment, and enabling smooth fluid transfer even in challenging environments. With different sizes, materials, and pressure ratings available, swivel joints offer the flexibility needed to meet specific application requirements and ensure efficient fluid handling.

Filter
Filter
2,669 items
content loaded
3650FT-0302 - 3" ALUM. SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$1,773.72

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0303 - 3" SWIVEL, ALUM, PTFE, TTMA FLANGE X TTMA FLANGE - OPW

$1,924.91

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0304 - 3" SWIVEL, ALUM, EPT, TTMA FLANGE X TTMA FLANGE - OPW

$1,730.07

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0305-FDA - 3" SWIVEL, ALUM, FOOD GRADE NITRILE, TTMA FLANGE X TTMA FLANGE, FDA LUBE - OPW

$1,543.76

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0401 - 4" ALUM SWIVEL JOINT BUNA-N MAIN FELT DUST SEAL - OPW

$2,149.56

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0402 - 4" ALUM SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$2,258.15

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0403 - 4" SWIVEL, ALUM, PTFE, TTMA FLANGE X TTMA FLANGE - OPW

$2,451.91

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0404 - 4" CAST ALUM SWIVEL JOINT EPT MAIN SEALS - OPW

$2,185.75

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0405-FDA - 4" SWIVEL, ALUM, FOOD GRADE NITRILE, TTMA FLANGE X TTMA FLANGE, FDA LUBE - OPW

$1,951.53

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0301 - 3" SWIVEL, ALUM, BUNA, TTMA FLANGE X FNPT - OPW

$1,480.94

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0302 - 3" CAST ALUM SWIVEL JOINT FLUOROCARBON MAIN SEALS" - OPW

$1,557.60

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0303 - 3" SWIVEL, ALUM, PTFE, TTMA FLANGE X FNPT - OPW

$1,708.78

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0401 - 4" SWIVEL, ALUM, BUNA, TTMA FLANGE X FNPT - OPW

$1,776.92

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0402 - 4" ALUM SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$1,886.58

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0404 - 4" CAST ALUM SWIVEL JOINT EPT MAIN SEALS - OPW

$1,814.18

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0301 - 3" ALUM SWIVEL JOINT BUNA-N MAIN SEAL FELT DUST SEAL - OPW

$1,571.44

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0302 - 3" ALUM SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$1,645.97

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0303 - 3" ALUM SWIVEL JOINT TEFLON MAIN SEAL FELT DUST SEAL - OPW

$1,798.21

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0401 - 4" ALUM SWIVEL JOINT BUNA-N MAIN FELT DUST SEAL - OPW

$2,176.17

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0402 - 4" ALUM SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$2,285.83

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650TFT-0402 - 4" SWIVEL, ALUM, FLUOROCARBON, w/TAIL-E AND TAIL-DTF - OPW

$1,885.52

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3655-0201 - 2" ALUM SWIVEL JOINT BUNA-N MAIN SEAL FELT DUST SEAL - OPW

$1,199.87

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3655-0202 - 2" ALUM SWIVEL JOINT FLUOROCARBON MAIN FELT DUST SEAL" - OPW

$1,244.59

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3655-0203 - 2" SWIVEL, ALUM, PTFE, FNPT X FNPT - OPW

$1,379.80

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0302 - 3" ALUM. SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$1,773.72

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0303 - 3" SWIVEL, ALUM, PTFE, TTMA FLANGE X TTMA FLANGE - OPW

$1,924.91

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0304 - 3" SWIVEL, ALUM, EPT, TTMA FLANGE X TTMA FLANGE - OPW

$1,730.07

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0305-FDA - 3" SWIVEL, ALUM, FOOD GRADE NITRILE, TTMA FLANGE X TTMA FLANGE, FDA LUBE - OPW

$1,543.76

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0401 - 4" ALUM SWIVEL JOINT BUNA-N MAIN FELT DUST SEAL - OPW

$2,149.56

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0402 - 4" ALUM SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$2,258.15

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0403 - 4" SWIVEL, ALUM, PTFE, TTMA FLANGE X TTMA FLANGE - OPW

$2,451.91

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0404 - 4" CAST ALUM SWIVEL JOINT EPT MAIN SEALS - OPW

$2,185.75

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FT-0405-FDA - 4" SWIVEL, ALUM, FOOD GRADE NITRILE, TTMA FLANGE X TTMA FLANGE, FDA LUBE - OPW

$1,951.53

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0301 - 3" SWIVEL, ALUM, BUNA, TTMA FLANGE X FNPT - OPW

$1,480.94

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0302 - 3" CAST ALUM SWIVEL JOINT FLUOROCARBON MAIN SEALS" - OPW

$1,557.60

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0303 - 3" SWIVEL, ALUM, PTFE, TTMA FLANGE X FNPT - OPW

$1,708.78

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0401 - 4" SWIVEL, ALUM, BUNA, TTMA FLANGE X FNPT - OPW

$1,776.92

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0402 - 4" ALUM SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$1,886.58

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650FTO-0404 - 4" CAST ALUM SWIVEL JOINT EPT MAIN SEALS - OPW

$1,814.18

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0301 - 3" ALUM SWIVEL JOINT BUNA-N MAIN SEAL FELT DUST SEAL - OPW

$1,571.44

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0302 - 3" ALUM SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$1,645.97

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0303 - 3" ALUM SWIVEL JOINT TEFLON MAIN SEAL FELT DUST SEAL - OPW

$1,798.21

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0401 - 4" ALUM SWIVEL JOINT BUNA-N MAIN FELT DUST SEAL - OPW

$2,176.17

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650LFT-0402 - 4" ALUM SWIVEL JOINT FLUOROCARBON MAIN SEAL FELT DUST SEAL" - OPW

$2,285.83

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3650TFT-0402 - 4" SWIVEL, ALUM, FLUOROCARBON, w/TAIL-E AND TAIL-DTF - OPW

$1,885.52

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3655-0201 - 2" ALUM SWIVEL JOINT BUNA-N MAIN SEAL FELT DUST SEAL - OPW

$1,199.87

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3655-0202 - 2" ALUM SWIVEL JOINT FLUOROCARBON MAIN FELT DUST SEAL" - OPW

$1,244.59

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

3655-0203 - 2" SWIVEL, ALUM, PTFE, FNPT X FNPT - OPW

$1,379.80

Should ship between 18 Nov and 02 Dec

Subject to factory lead times

FAQS