Material Handling

The Material Handling category within the Bulk Solids division encompasses equipment and solutions designed to efficiently move, feed, store, and control the flow of bulk materials throughout the filtration process...

Categories in Material Handling (1)
Box Tilters
Box Tilters

Box Tilters are essential components in bulk solids filtration operations, designed to safely and efficiently unload materials from containers such as gaylords, bins, and totes. These devices improve material flow and operator ergonomics by positioning bulk containers at an optimal angle, reducing manual handling and minimizing product loss during transfer.


Ideal for use in food processing, chemical, pharmaceutical, and plastics industries, box tilters support consistent material delivery to downstream equipment such as feeders, conveyors, and screening systems. Available in various load capacities and configurations, they integrate seamlessly into automated or manual material handling workflows, enhancing safety, productivity, and throughput in bulk solids applications.

Filter
Filter
2,659 items
content loaded
Control Package for 309-E3 Drum Tumbler. Explosion-Proof 3-PH 460V 60Hz 14 RPM. Start/Stop, Run/Jog. Consult electrician for wiring.

$7,274.99

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for 309-E3-575 Drum Tumbler. Explosion-Proof 3-PH 575V 60Hz 14 RPM. Start/Stop, Run/Jog. Consult electrician for wiring.

$7,274.99

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-1 Drum Tumbler. 1-Phase 115V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,536.05

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-1-50 Drum Tumbler. 1-Phase 220V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,651.99

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-1 Drum Tumbler. 1-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Loackable Fused Disconnect.

$3,369.39

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3 Drum Tumbler. 3-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,195.49

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3-50 Drum Tumbler. 3-Phase 230V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,304.18

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3-50 Drum Tumbler. 3-Phase 400V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,304.18

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3 Drum Tumbler. 3-Phase 460V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,036.08

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3-575 Drum Tumbler. 3-Phase 575V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$4,246.16

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E1 Drum Tumbler. Explosion-Proof 1-PH 115V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,927.18

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E1 Drum Tumbler. Explosion-Proof 1-PH 208V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$5,420.01

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E1-50 Drum Tumbler. Explosion-Proof 1-PH 220V 50Hz. Start/Stop Buttons. CONSULT ELECTRICAN FOR WIRING.

$6,782.26

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E1 Drum Tumbler. Explosion-Proof 1-PH 230V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,782.26

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3 Drum Tumbler. Explosion-Proof 3-PH 208V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,550.39

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3 Drum Tumbler. Explosion-Proof 3-PH 230V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,361.99

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3-50 Drum Tumbler. Explosion-Proof 3-PH 230V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,361.99

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3-50 Drum Tumbler. Explosion-Proof 3-PH 400V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$7,101.08

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3 Drum Tumbler. Explosion-Proof 3-PH 460V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,376.48

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-1 Drum Roller. 1-Phase 115V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,767.92

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control package for model 456-1-50 Drum Roller. 1-Phase 220V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,289.69

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-1 Drum Roller. 1-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,289.69

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-3 Drum Roller. 3-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,028.83

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-3-50 Drum Roller. 3-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,289.69

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for 309-E3 Drum Tumbler. Explosion-Proof 3-PH 460V 60Hz 14 RPM. Start/Stop, Run/Jog. Consult electrician for wiring.

$7,274.99

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for 309-E3-575 Drum Tumbler. Explosion-Proof 3-PH 575V 60Hz 14 RPM. Start/Stop, Run/Jog. Consult electrician for wiring.

$7,274.99

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-1 Drum Tumbler. 1-Phase 115V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,536.05

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-1-50 Drum Tumbler. 1-Phase 220V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,651.99

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-1 Drum Tumbler. 1-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Loackable Fused Disconnect.

$3,369.39

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3 Drum Tumbler. 3-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,195.49

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3-50 Drum Tumbler. 3-Phase 230V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,304.18

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3-50 Drum Tumbler. 3-Phase 400V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,304.18

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3 Drum Tumbler. 3-Phase 460V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,036.08

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-3-575 Drum Tumbler. 3-Phase 575V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$4,246.16

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E1 Drum Tumbler. Explosion-Proof 1-PH 115V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,927.18

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E1 Drum Tumbler. Explosion-Proof 1-PH 208V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$5,420.01

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E1-50 Drum Tumbler. Explosion-Proof 1-PH 220V 50Hz. Start/Stop Buttons. CONSULT ELECTRICAN FOR WIRING.

$6,782.26

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E1 Drum Tumbler. Explosion-Proof 1-PH 230V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,782.26

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3 Drum Tumbler. Explosion-Proof 3-PH 208V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,550.39

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3 Drum Tumbler. Explosion-Proof 3-PH 230V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,361.99

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3-50 Drum Tumbler. Explosion-Proof 3-PH 230V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,361.99

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3-50 Drum Tumbler. Explosion-Proof 3-PH 400V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$7,101.08

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 310-E3 Drum Tumbler. Explosion-Proof 3-PH 460V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,376.48

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-1 Drum Roller. 1-Phase 115V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,767.92

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control package for model 456-1-50 Drum Roller. 1-Phase 220V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,289.69

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-1 Drum Roller. 1-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,289.69

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-3 Drum Roller. 3-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,028.83

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-3-50 Drum Roller. 3-Phase 230V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,289.69

Should ship between 02 Dec and 16 Dec

Subject to factory lead times