Material Handling

The Material Handling category within the Bulk Solids division encompasses equipment and solutions designed to efficiently move, feed, store, and control the flow of bulk materials throughout the filtration process...

Categories in Material Handling (1)
Box Tilters
Box Tilters

Box Tilters are essential components in bulk solids filtration operations, designed to safely and efficiently unload materials from containers such as gaylords, bins, and totes. These devices improve material flow and operator ergonomics by positioning bulk containers at an optimal angle, reducing manual handling and minimizing product loss during transfer.


Ideal for use in food processing, chemical, pharmaceutical, and plastics industries, box tilters support consistent material delivery to downstream equipment such as feeders, conveyors, and screening systems. Available in various load capacities and configurations, they integrate seamlessly into automated or manual material handling workflows, enhancing safety, productivity, and throughput in bulk solids applications.

Filter
Filter
2,659 items
content loaded
Control Package for model 456-3-50 Drum Roller. 3-Phase 400V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,159.26

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package fro model 456-3 Drum Roller. 3-Phase 460V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,159.26

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package fro model 456-3-575 Drum Roller. 3-Phase 575V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$2,811.45

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E1 Drum Roller. Explosion-Proof 1-Phase 115V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,927.18

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E1 Drum Roller. Explosion-Proof 1-Phase 208V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$5,420.01

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E1-50 Drum Roller. Explosion-Proof 1-Phase 220V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,767.77

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E1 drum Roller. Explosion-Proof 1-Phase 230V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,767.77

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3 Drum Roller. Explosion-Proof 3-Phase 208V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,043.17

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3 Drum Roller. Explosion-Proof 3-Phase 230V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,086.64

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3-50 Drum Roller. Explosion-Proof 3-Phase 230V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,354.75

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3-50 Drum Roller. Explosion-Proof 3-Phase 400V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$7,086.59

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3 Drum Roller. Explosion-Proof 3-Phase 460V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,093.89

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3-575 Drum Roller. Explosion-Proof 3-Phase 575V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$7,086.59

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

RETAINER, RAM CUP, 300LC

$29.95

Should ship between 18 Nov and 25 Nov

Subject to factory lead times

OPTION: Factory Installed 1-Gallon of Food Grade Hydraulic Oil

$174.27

Should ship between 18 Nov and 25 Nov

Subject to factory lead times

POWER SUPPLY, 24VDC OUTPUT

$473.18

Should ship between 18 Nov and 25 Nov

Subject to factory lead times

OPTION: Factory Installed 3-piece drum holder on NEW 400 or 500 Series drum handler

$567.42

Should ship between 18 Nov and 25 Nov

Subject to factory lead times

OPTION: Factory Installed Green Battery on NEW drum handler. Environmentally friendly lithium-ion battery with up to 5 yr. design life.

$4,420.06

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-1-115, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$10,941.46

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-1-220-50, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$8,773.17

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-1-230, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$8,773.17

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-3-220-50, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$8,773.17

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-3-230, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$11,883.44

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-3-380-50, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$8,773.17

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

Control Package for model 456-3-50 Drum Roller. 3-Phase 400V 50Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,159.26

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package fro model 456-3 Drum Roller. 3-Phase 460V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$3,159.26

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package fro model 456-3-575 Drum Roller. 3-Phase 575V 60Hz. Timer, Start/Stop, Emergency Stop, Lockable Fused Disconnect.

$2,811.45

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E1 Drum Roller. Explosion-Proof 1-Phase 115V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,927.18

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E1 Drum Roller. Explosion-Proof 1-Phase 208V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$5,420.01

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E1-50 Drum Roller. Explosion-Proof 1-Phase 220V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,767.77

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E1 drum Roller. Explosion-Proof 1-Phase 230V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,767.77

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3 Drum Roller. Explosion-Proof 3-Phase 208V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,043.17

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3 Drum Roller. Explosion-Proof 3-Phase 230V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,086.64

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3-50 Drum Roller. Explosion-Proof 3-Phase 230V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,354.75

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3-50 Drum Roller. Explosion-Proof 3-Phase 400V 50Hz. Start/Stop Buttons. Consult electrician for wiring.

$7,086.59

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3 Drum Roller. Explosion-Proof 3-Phase 460V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$6,093.89

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

Control Package for model 456-E3-575 Drum Roller. Explosion-Proof 3-Phase 575V 60Hz. Start/Stop Buttons. Consult electrician for wiring.

$7,086.59

Should ship between 09 Dec and 16 Dec

Subject to factory lead times

RETAINER, RAM CUP, 300LC

$29.95

Should ship between 18 Nov and 25 Nov

Subject to factory lead times

OPTION: Factory Installed 1-Gallon of Food Grade Hydraulic Oil

$174.27

Should ship between 18 Nov and 25 Nov

Subject to factory lead times

POWER SUPPLY, 24VDC OUTPUT

$473.18

Should ship between 18 Nov and 25 Nov

Subject to factory lead times

OPTION: Factory Installed 3-piece drum holder on NEW 400 or 500 Series drum handler

$567.42

Should ship between 18 Nov and 25 Nov

Subject to factory lead times

OPTION: Factory Installed Green Battery on NEW drum handler. Environmentally friendly lithium-ion battery with up to 5 yr. design life.

$4,420.06

Should ship between 02 Dec and 16 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-1-115, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$10,941.46

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-1-220-50, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$8,773.17

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-1-230, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$8,773.17

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-3-220-50, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$8,773.17

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-3-230, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$11,883.44

Should ship between 25 Nov and 02 Dec

Subject to factory lead times

KIT, ENCLOSURE W/ SAFETY INTERLOCK, FOR 1-300-3-380-50, FIELD INSTALL, SHIPS SEPARATELY W/ 2ND FREIGHT BILL

$8,773.17

Should ship between 25 Nov and 02 Dec

Subject to factory lead times